34
Installing Spot-Glued Gaskets
Spot gluing of Elastomeric gaskets is covered under
Tranter’s U.S. Patent #5070939.
In the following procedure, after the glue is applied to the plate
at the appropriate spots, allow it to set for a minimum of 30 sec
before the gasket is mounted. Work on pairs of plates to allow
for this curing time. Work in a well-ventilated area.
1. Clean the gasket groove in one plate with a rag moistened
with Methyl Ethyl Ketone (MEK).
2. Apply a 1/8 in. diameter spot of Pliobond 30 approximately
every 4 in. centered in the gasket groove of the plate just
cleaned.
a) Apply the glue so there are no thin spots.
b) Apply spots of glue at the “T” joints (see Figure 44).
3. Clean the groove of a second plate, as in step 1.
4. Apply adhesive to the second plate, as in step 2.
5. Install the gasket on the fi rst plate. Make sure the gasket is
oriented as shown in Figures 15 and 32.
6. Install the gasket on the second plate, as in step 5.
7. Compress the gasket by placing the plate under a weighted
sheet of wood. The longer the compression time, the better
the bond. Twelve hours cure time at room temperature
(70°F) should be allowed to assure maximum adhesion of the
gasket to the plate for all elastomers except EPDM. EPDM
gaskets require a minimum of 24 hr cure time at room
temperature (70°F) to assure an adequate bond. (When
several plates are being gasketed, they can be stacked on top
of each other with the weighted wood sheet placed on the
top plate of the stack.)
Figure 44
Locations at “T” joints where glue must be applied.
Circled areas show
the 14 “T” joints
NOTE: Refer to page 24 when using mixed gaskets.
NOTE: The purpose of working with two plates
simultaneously is to allow the adhesive to set for
a minimum of 30 sec before the gasket is applied.
When working with small plates, a third plate can be
incorporated into the above procedure to obtain set
time. The curing time must not exceed 3 min.
8. After adequate compression time, use solvent to remove any
excess adhesive that may have seeped-out past the edges of
the gasket.
9. Reinstall plate(s) in unit insuring that the gasket surface
and the sealing surface of the plate ahead are wiped clean to
provide a positive seal.